Can I resurface my Long Island deck with composite boards?
Yes, if the frame under your deck is still strong. Resurfacing means taking off the old boards and putting new composite boards on the posts, beams and joists you already have. If the frame has rot, loose posts or weak footings, those parts are fixed first, or the deck is rebuilt. A deck inspection can be booked on its own to find out which one your deck needs.
What does it mean to resurface a deck with composite?
It means the old deck boards come off and new composite boards go down on the frame that is already there.
The frame is the part you do not see much: the posts, the beams and the joists the boards sit on. On many older decks, the boards wear out long before the frame does. Wood boards splinter, cup and fade. Older composite boards can stain, swell or crack.
When the frame is still sound, you do not have to tear the whole deck down. New boards go on top of the old structure. The stairs, railings and trim are often redone at the same time, so the whole deck looks new.
Level Line does this work as part of its deck repair and resurfacing service. It is a different job from a full tear-out and rebuild.
How do I know if my deck frame is good enough to keep?
The frame has to be solid, dry and firmly tied to the house and the ground, and only a close look under the deck can tell you that.
Some signs are easy to spot. Posts that lean, joists that feel soft when you push a screwdriver in, rust on the metal hangers, or a deck that bounces when you walk on it all point to trouble. So does dark staining where the deck meets the house.
Other problems hide until the old boards come off. That is why the frame is checked again once the boards are up, before any new boards go down. A few bad joists can be replaced. A frame with rot all through it is better rebuilt.
If you are not sure which way your deck leans, read should I repair my deck or replace it. It walks through the signs in more detail.
Can I swap only the worn composite boards instead of the whole floor?
Sometimes, but an older composite line may no longer be made, and then a close match may not be possible.
Composite boards change color as they sit in the sun. Even when the same line is still sold, a new board can look different from the boards that have been outside for years.
Some composite lines from years ago have been stopped altogether. When that happens, there may be no board that matches at all. A patch of new boards in the middle of an old deck can stand out more than the damage did.
In that case, many homeowners choose to resurface the whole deck. Every board then matches, and the deck starts fresh.
Does the frame need changes before composite boards go on?
Often it does, because composite boards and salt air both ask more of a frame than old wood boards did.
Composite boards usually need the joists set closer together than wood boards did. If the joists are too far apart, the new boards can sag between them. Extra joists can be added to an old frame to fix this.
On Long Island, salt air near the bays and the Sound wears out metal fast. Level Line uses salt-rated hardware and puts hurricane clips and wind-uplift connectors on every deck. Old hangers and screws that have rusted are replaced while the deck is open.
The spot where the deck meets the house also gets a close look. Water that gets behind the ledger board is a common cause of rot on older decks.
Do I need a permit to resurface my deck?
It depends on your town and on how much of the deck is being changed, so check with your building department before work starts.
Each town on Long Island sets its own rules. Changing the frame, the stairs or the railings can make a permit more likely than changing boards alone.
When a permit is needed, Level Line prepares the drawings for the application, unless an architect is assigned to the job. You submit the application with what Level Line provides, Level Line arranges and attends the inspections, and Mark is available by phone throughout.
For more on how this works, see do I need a permit to build a deck on Long Island.
Which composite boards can go on a resurfaced deck?
Level Line installs Trex, TimberTech, Azek and other PVC, and Fiberon, and it leans toward Trex.
Level Line is a Trex Certified Installer and a TimberTech Certified Installer. Each line comes in many colors and grains, so you can pick a look that suits your house.
You can also change your railings at the same time. Level Line puts in all the common railing systems, such as Trex Signature, TimberTech, cable rail, aluminum picket and wood.
To see the boards and colors side by side, look through the composite decks page.

More questions on this
How long does a deck resurfacing job take?
Level Line builds take from one day to two to four weeks, by the size and scope of the job, and any frame repairs found under the old boards add to it.
Can I add lights while my deck is being resurfaced?
Yes. Low-voltage post-cap, stair and rail lights are an option, and it is easiest to run the wiring while the deck is open.
Can a wood deck be resurfaced with composite boards?
Yes, as long as the wood frame is sound and is set up to carry composite boards, which may mean adding joists.
Who do I call to have my deck looked at?
Call Level Line at 516-220-3146. A deck inspection can be booked on its own.
Sources for this answer
- Prescriptive Residential Wood Deck Construction Guide (DCA 6), American Wood Council
- Check Your Deck consumer checklist, North American Deck and Railing Association
- Requirements and Guidelines for Filing Applications, Town of Huntington, Division of Building and Housing
